Month by Month  2023  a year in Rail 
Sunday Jan 8th Hull Trains operate two return services into St Pancras , diverted by planned engineering work on ECML. 125 mph Bi Mode class 802 operating on Diesel as overhead Line only rated for 100 mph  south of Bedford.
PantoBot 3d  pantograph scanners/ train identification cameras at Ampthill  Tunnel  south bores and at Hendon..
Feb 1st and 3rd  start made on clearing veg
Cricklewood south neck






Luton Crescent Road a bit shorter




New Hand Point ( lockable) Luton .
Saturday Feb 11th Visitors 
Track Circuit Operating Devices  (T-COD) arrive .
Up Hendon speed project  10-30-10-30
Down Hendon speed project 
Brent Curve Junction 

826B Plain lined Sep 24 2023


.March speed project 






April  Silkstream approach 








April 15th  DEMU railtour visits as part of London Terminus " Bakers Dozen" tour




April 22/23   Class 73 action on Moorgate Lines drainage renewal 





Luton Limbury Road north headshunt  buffer stop 





May Industrial action - out cleaning countdown signage









Dock jcn  signage 




New entish Town workstation simulator








Wrapping up May  more industria action  new signage at SAC Centre siding to protect TCD 





Renewal Down Slow Harpenden 






June 25th dewirement at Napsbury  1Z99 assists 700 into energised section




Export car train 6X11







July  Elstree Tunnel vent shafs 






July 22  unit recovery at Luton Crescent Road 













August    3Z07 S&C Video Survey at St Pncras  ( 12th)




















​ballast tray  sign support 






Churchyard siding Signage upgrade 







WH275  Position light resited Sep 10












September 30th Industrial action by ASLEF - Belsize Tunnel​



Limbury Road siding



Run Round Road stop block - reflective plate added Oct 





That time of year again 3J93 RHTT 







Baywatch  October 27th   Bletchley branch limited service






Saturday Visitors Oct 28th 






Limbury Road Semi Automatics  








November , clearing the clutter at Hendon 



RHTT reversing at Cricklewood curve jcn 5 weeks done






WH230  Was 228 









New walking route Cricklewood Curve












07:16 10 12 23 BCZ opens 
 first train  700 122 up 700 146 down





At 22:30 on 24th Dec  the 1979 vintage signalling control panel was signed out of use, last train O70 Panel 2.



At 04:40 on 27th Dec the four new workstations take over signalling control,first train V10 from Cricklewood depot