3 Febuary 1989 45 106 catches fire on 1C15 07:12 Derby-St Pancras LHCS,in the Hendon area,withdrawn on Feb 20th. Assisted by97 472 ex W'boro
25 February 1991 terrorist Incident- bomb explodes on Down Fast at Napsbury Lane St Albans,No Injuries but several sleepers and rail destroyed
20 August 1991 - 47 594 and stock arrive at St Pancras to Launch new Rail Express Systems, new name for parcels sector.
12 October 1991 - WCML services diverted Nuneaton-Wigston -Bedford dragged by Diesels,then electics pan up to/from St Pancras.
14 June 1992 Class 50 D400 & 50 007 work a diverted charter into St Pancras
Christmas 1992/1993 - Burning car tyre thrown onto roof of Kentish Town signal interlocking building-hand signalling introduced whilst repaired
19 February 1994, DMU visits Harper Lane stone loop & St Albans centre siding on BLS Railtour "TheRadlett Roundabout"
26 May 1995 Last run of Yorkshire TPO St Pancras-Newcastle.
22 September 1995 47 849 works final loco hauled (1C05) 06:25 Derby-St Pancras and (1E62) 17:20 return.
17/18 November 1995 47 501 cover various Nottingham-St Pancras diagrams due to shortage of HSTs.
29 April 1996 73 205 & 73 210 top&tail a 5 car Gatwick Express set into St Pancras for launch event
07 May 1996 Cricklewood recess sidings closed (see 2016)
20 July 1997 engineers train derails at Cricklewood link here
17 September 1997 - 47 627 works exhibition train into St Pancras loco and stock in 'Celebrations'livery
25 November 1999 - Luton Airport Parkway station opens - but still a bus link to Airport (see 03 March 1986).
Summer 2002- 47 703 & 47 709 work daily Nottingham-St Pancras - Sheffield LHCS service, 47 712 & 47 488 also feature
11 October 2002- last LHCS (1F48) St Pancras - Sheffield (47 703)
08 April 2004 45 112 runs 10:37 St Pancras - Leicester & 13:22 return to mark closure of St Pancras for redevelopment
01 April 2006 First Group operate combined Thameslink (& Great Northern) Franchise (eventually given up Sept 14 2014- just over 8 years)
19 July 2007 - freight train 'runaway' at Camden Road tunnel - link here
09 December 2007 King's Cross Thameslink closes
20 March 2009 Moorgate & Barbican Close
11 September 2010- 319 derails on trap point at St Albans centre siding whilst reversing south to north.
15 May 2011- steam loco 34067 'Tangmere' works a London St Pancras (plat 2) to Canterbury West Charter (via Cricklewood),37 516 brings the ecs
26 May 2011 (Thursday pm peak) 8 Car 377 (1W95) stalls in the tunnels on down Moorgate whilst full & standing.
26 September 2011 - bi directional signalling introduced Dock Junction- Clerkenwell Tunnels (phase 1).
07 November 2011 - bi directional signalling introduced Clerkenwell Tunnels-City Thameslink (phase 2).
11 November 2011 - afternoon signal system failure Cricklewood-Radlett affects all lines
14 November 2011 - new footbridge opens at West Hampstead with new entrance
12 December 2011 - introduction of 12 car class 377s between Bedford & Brighton, 3 x 377/2 on loan from Southern help out - (207/211/212)
these three units make a 12 car with FCCvinyls replacing Southern green livery -but these can not operate with 377/5 due to software issues
23 December 2011 northbound 8 car looses pantograph between Farringdon & Kings Cross Thameslink (closed) causing evening delays
16 January 2012 power failure to signalling supply between Farringdon & Kentish Town during evening peak
05 February 2012 377 522 derails on hand points entering Bedford Carr Sidings during "heavy" snow
08 March 2012 lunchtime - tree falls on fast lines at St Albans North from external property
27 March 2012 early morning power failure to signalling supply at Flitwick affects morning peak.
10 April 2012 (Tuesday) PoSa Signalling commisioned between Dock Junction North & Farringdon
April > June 2012 Leagrave Junction to be renewed, new pointwork with concrete bearers over a series of weekend/bank holiday possessions.but several delays causes project to fall behind
23 May 2012 almost a year since the incident , RAIB publish report on 26 May 2011 incident with train 1W95
report here> http://www.raib.gov.uk/latest_news/120523_pn_kentish_town.cfm
25 May 2012 Overhead Lines down between Harpenden & St Albans affecting slow lines through evening peak.
08 June 2012 up service hits fallen tree on approach to Kentish Town, unit stalled 40 customers evacuated onto rescue train
17 June 2012 single line working Flitwick Jcn -Luton North Junction, up trains over down fast, buses replace down trains St Albans -Bedford whilst new switches & crossings installed at Leagrave junction where 3 of 4 lines shut.
01 July 2012 5 car EMT meridian works 125mph test train Sharnbrook to Flitwick as part of line speed improvement scheme
16 July 2012 £500 Million Electrification plan North from Bedford announced (to Sheffield via Derby, stubs to Nottingham and Corby)
24 July 2012 70 015 becomes 1st class 70 suth of Bedford working 6L87/6M90
24/25 July 2012 overnight cable theft at Elstow disables Bedford signal Interlocking
27 July -12 August 2012 combined maintenance/operations teams stand-by at ALL junctions to ensure fast response to any incident affecting Olympic flow
31 July 2012 67016 & 67020 top/tail 8 Mk2 coaches on 1Z24 02:00 St Pancras to Derby Olympic relief - but runs (5Z24) empty to Toton - not required.
September 2012 High Output Ballast cleaning starts on the slow lines
November 2012 Work starts on Cricklewood sidings upgrade - longer sidings for 12 car stabling,CET emptying and better security & lighting.
06 December 2012 Afternoon disruption after person hit by train at Westoning
12/12/12 Security Incident at Bedford disrupts evening peak- one person arrested,affected unit moved to sidings for Bomb Squad attention.
19-20 December 2012 Strike by RMT signallers and Shift Signaller Manager/ssm/ (from 07:00 Wed-06:59 Fri) at West Hampstead Signal Box.
24-27 December 2012 Cricklewood Maintenance Ground Frame removed and repaced by new points controlled by WH Psb
26 December 2012 After formal closure notice issued for Ampthill foot crossing - new footbridge craned into place as part of linespeed enhancments.
13 February 2013- Overhead line dewirement at Radlett up fast, unit on down fast runs into fallen cables causing damage to cross span that closes all 4 lines.
73 202 Electro-Diesel loco assists damaged 8 car 319 on up fast and tows empty to Cricklewood, 73 202 ran 1Z99 from Battersea Stewarts Lane,East Croydon then through the'core'
02 March 2013 - New Measurement train works on HS1 lines via maintenance siding link at St Pancras whilst en route Derby-Dollands Moor-Derby
26 May 2013 replacing former mechanical ground frame, new power points installed (726) at Cricklewood north end linking up slow to carriage sidings
14 June 2013 Finally UK DfT Gov announce £1.6 Billion order for new Thameslink rolling stock (1.140 vehicles) is awarded to Siemens led consortium
27 June 2013 Siemens sign deal with Department of Transport for Desiro City new trains for Thameslink 60 x 8 car units,55 x 12 car units = 1140 vehicles
17 July 2013 Southern TOC announce order of 116 vehicles (29x4car) class 377/8 (later class 387 according to DfT!) from Derby based Bombardier for short term use on the Thameslink route pending delivery of German built Siemens class 700. (further140 vehicles also an option in contract if needed).
28 October 2013 The St Jude storm hits, no service south of Luton due to fallen external power lines that caused OLE damage at Harper Lane, Radlett
24 November 2013 Fast line line speed increased from 110mph to 125mph in advance of Dec 9th timetable change
25/26 December 2013 New footbridge installed at Elstree Borehamwood, lifts will be commissioned later
25/26 December Cricklewood North brought into use, Cricklewood South closes for redevelopment.
29 December 2013 Hull trains operated two services non stop from Doncaster to St Pancras due to engineering blockade at Peterborough using class 180 units
17 January 2014 Extensive dewirement at Hendon station with multiple trapped trains
28 January 2014 Two coaches of Desiro City class 700 (mock up) unveiled to the press at London's ExCel centre (Docklands)
23 May 2014 DfT announce GoVia Thameslink Railway (GTR) Ltd awarded TSGN franchise
29 July 2014 47 790 with 57 307 top/tail work private charter Edinburgh-St Pancras. 57 307 fails on ecs return so 47 790 leads from Cricklewood!
15 August 2014 387 101 released from Derby Litchurch Lane for testing at Old Dalby test track
24 August 2014 Hull trains services run to/from St Pancras due to ECML engineering
14 September 2014 Thameslink Franchise transfers from First Group to Go-Ahead (GTR) at 2am
03 November 2014 class 387 begin AC test running Bletchley-Wembley-Crewe-Wembley-Bletchley
04 November 2014 class 387 begin AC/DC testing Bletchley - Brighton-Bletchley
08 November 2014 Steam loco 46115 'Scots Guardsman' operates at St Pancras - Lincoln charter *return to King's Cross)
08 December 2014 class 387/1 begin revenue use (8 car) with 05:40 Brighton > Bedford
10 January 2015 all lines blocked at Harpenden North as radio mast damaged in high winds leans towards railway
25 January 2015 all lines blocked at Farringdon North due to track flooding after burst water main(s)- various closure through the week
01 February 2015 Rehearsal transfer of signal control from West Hampstead westcad (panel 1) to Three Bridges ROC
14 February 2015 West Hampstead WestCad (panel 1) and Victoria Panel 6 transferred to Three Bridges ROC signal prefixes change to TWH and TVS
12 July 2015 Branch Line Society Thameslink Tracker railtour 319 444 visits various sidings on the route, former NSE Sector Director Chris Green on board
13 July 2015 planned opening of Up Sundon Loop does not take place
29 July 2015 Colas loco 70 806 is trialed on 6E38 to test fuel consumption
30 July 2015 running as 6X66, 66 769 hauls 700 106 from Dollands Moor to the new depot at Three Bridges, move delayed by unrest in France.
01 August 2015 313 121 starts etcs cab signalling tests through the 'core' area
09 August 2015 up Sundon (freight) loop commissioned (non electrified) but 1st 560 yards wired
24 August 2015 Down slow line dewirement Sandridge at Lunchtime affects evening peak
06September 2015 Canal Tunnels planned to be brought into use for non revenue moves but date tbc waiting overhead line commissioning
07 September 2015 GBRf start using new 11 north end freight siding Cricklewood for spoil/soil traffic to Calvert
05 October 2015 7M08 sand/aggregate train derails in Limbury Road sidings- no affect on mainline
06 October 2015 emergency engineering closes the 'core' route during evening peak
17 November 2015 tree falls at St Albans onto fast lines during storm 'Barney'.
24 November 2015 700107 reaches Brighton on DC tests
25 November 2015 700107 reaches Blackfriars (bay) on DC tests
01 December 2015 700106 reaches Bedford on AC tests
09 December 2015 700107 700108 work Three Bridges to Leagrave and return as 24 car formation test
15 January 2016 60 056 expires at Hendon (chord line) with load30 tanks on 6V70, whole train returns North behind 70 802 6Z38
11January 2016 Low Key opening event with 319 459 declares Cricklewood south sidings open.
29 April 2016 Start made on clearing vegetation to allow Cricklewood recess sidings t reopen (see 1996)
07 May 2016 HST Railtour becomes first passenger working over UpSundon Loop
24 May 2016 68 004 with 37 422 37 425 and inspection saloon 975025work Derby-Willesden via mml
24 May 2016 press launch (700 109) Blackfriars to East Croydon
04 June2016 Flying Scotsman runs down direction London Victoria - MML-York
20 June 2016 class 700 108 in public use Brighton to London Bridge
23 June 2016 Signalling power supply failure halts all trains for 3 hour period 18:40 onwards
30 June 2016 700 109 operates 1W26 11:05 Brighton to Bedford the first passenger run (returns to 3 Bridges)
11 July 2016, 7 departures from Bedford operated by FLU 700 with 2 units running empty 10/7 3 Bridges to Jowett sidings
11 September 2016 Canal Tunnels open 01:45
03 October 2016 RLU 8 car class 700 introduced (Bedford - Brighton)
31 October 2016 RLU 8 car introduced Sutton Loop services from St Albans
08 November 2016 Temporary Block working following loss of Luton TDM / Interlocking
17 November 2016 8 car 319 (2O86) stalls across Carlton Road junction following OCB, evening peak seriously disrupted
05 February 2017 last scheduled use of class 387 stock
23 February 2017 Super storm Doris brings trees down at St Albans & Harpenden blocking fast lines
07 April 2017 Cricklewood recess siding opens as Cricklewood Aggregate Terminal ( C.A.T.)
12 April 2017 12 pump fire disrupts evening peak at Hendon builders merchants
27 August 2017 Final day of class 319 operation ( 217 & 435) 1W46 18:14 Brighton to Bedford then 5V47 to sidings
28 August 2017 All class 700 run out for revenue use
31 August 2017 37 884 removes last two 319s from Cauldwell depot (440 &443) to store at Long Marston
01 December 2017 Cauldwell depot headshunt extended to hold 12 cars (was 8) and depot now stabling only
23-26 December 2017 concrete slab track removed Kentish Town to Camden Road Tunnel area on fast lines
09 February 2018 Barnet Council gran planning permission for CAT siding aggregate terminal * see 07 Aoril 2017)
12 February 2018 43043& newly named 43467 work 15:32 Nottingham-StPancras and return 17:45 to Derby via Nottingham.
26 February 2018 Peterborough to Horsham and Cambridge to Brighton services start using Canal Tunnel Link
9J57 Pboro - Horsham(11:10) 9J52 Horsham- Pboro (11:45) 9S24 Brighton -Cambridge (13:06)
9J63 Pboro - Horsham (14:39) 9J58 Horsham - Pboro (15:21) 9S39 Cambridge - Brighton (15:23)
12 March 2018 9S27 Cambridge-Brighton (12:22) & 9S36 Brighton-Cambridge (15:50) use Canal Tunnels
17 March 2018 1Z17 Railtour uses Up Sundon Loop (see 7th May 2016 )
03 July 2018 50 008 arrives Wembley Yard to Cricklewood route learning for DCR
05 November 2018 Cricklewood South Freight siding opens (6Y70)
17 November 2018 717 004 and 009 run Cricklewood to Bedford Jowett sidings for cleaning
26 November 2018 RHTT 3J92/93 receives class 70 haulage
30 November 2018 mid day signal power supply failure Harpenden to St Albans, TBW in use on fast lines
12 December 2018 Wednesday 07:55-08:55 20 tph delivered up direction platform 'A' St Pancras 17 TL 03 GN
14 December 2018 angel trains EMT Power Car 43480 is named " West Hampstead PSB" at Kentish Town station 1Z22
25 January 2019 9K06 stalls in Camden Road Tunnel with one pan raised, controlled evacuation via cross transfer
28 January 2018 new siding 3 connection at Limbury Road opens to traffic
28 March 2019 6Z63 Marks first arrival from Peak Forest with Load 22 Limstone into new Limbury Road No 3 ing23232xx 23 April 2019
23 April 2019 23 004 commences service on Marston Vale Line
25 July 2019 significant de wirement West Hampstead affecting up fast
09 August 2019 17:00 onwards significant OLE frequency loss, class 700s come to a stand
31 July 2019 43 467/468 back to back recover HST set involved with de wirement (43076/43047)
10 August 1Z25 EMT staff special HST runs via Up Tottenham
17 August 2019 EMT Franchise ends
23 August 2019, PM rush hour overhead line trip causes disruption south of Mill Hill Broadway
24/25 August 2019 Hull trains run class 180 and HST into St Pancras diverted by planned ECML works 47 813 (ROG) stand by Loco at Wellingborough DGL
28 September 2019 overhead line incident at Luton Hoo 37 608 with Dellner coupler sent 1Z99 to drag 700 from switched off area
xx October 2019 - drainage failure Elstree Tunnel fast line bore
23 October 2019 broken rail Hendon chord line plain li1ned
15 Nov ember 2019 66 183 enters CAT siding from south connection
17 November x 5 sets of 'M63' catch points removed on Hendon Lines, 788 A remain WH North
17 November 5M69 700 057 derails on UP departure line Cricklewood,4 axles off over 2 cars. Re Railed 18th and 19th
21 November 700 075 Wheelskated to Hornsey in early hours under own power
02 Jan 2020 54mp to 58mp recontrolled to EMCC Kettering workstation, including Sharnbrook Jcn
16 Jan 2020 Overnight loss of Signalling Harpenden - ESW introduced Luton to St Albans
25/26 Jan 2020 Hull trains operate Class180 to/from St Pancras
06Feb 2020 Dewirement down fast Luton Airport Parkway. 47 813 deployed to Luton.
09 Feb 2020 Storm Ciara disruption 57 305 standby Loco at Bedford
15 Feb 2020 Storm Dennis disruption 57 305 standby Loco at Luton
01 April 2020 ROG 47,class 91 Mark3 coaches class 90 Mark 3 coaches 2 x 20 visit Bedford OHLE rehersal test train
07 May 2020 6C77 Rail Distribution Train unload failure shunts into Crescent Road to clear mainline
08 May 2020 6C77 3 mph propelled move Crescent Road to Limbury Road
23-25 May 2020 fixed crossings renewed Cricklewood South Junction
29 May 17:20 Cricklewood North siding group 2 - 6 close
29 May 2020 23:00 Cricklewood NX Panel closes
01 June 2020 Cricklewood Westcad control opens
17/18 October Hull trains run IET Paragon sets tp/from St Pancras (diesel powered)
10-12 Nov 20 50 007 and 50 049 cascade class 360 units Ilford to Cricklewood for E M R
19 Nov 20 57 310 visits Cricklewood for class 360 coupling tests 360 116 moves under iwn power in depot
26 Nov 20 12 car 360 operates Cricklewood to new stabling siding at Kettering ( middle pan lowered) K E S Kettering Electric Sidings
11 Dec 20 Final E M R "VP185" HST set in passenger use. power cars 43 047 and 43 049 1995-2020
12 Dec 20 Midland Pullman innaugural run 43 046 and 43 055 Load 9
-
08-16 Feb 2021 Down fast blocked Leagrave to Flitwick, earthork failure at Harlington North
16 Feb 2021 Class 360 runs Corby to St Pancras pti testing
02-05 April 2021 Up slow moved to new alignment at Brent Cross
15 May 2021 final day of HST operation 43 102 leads 1F70 20:02 St Pancras to Leeds via Derby with NL58 and 43 274
28-30 August 2021 diamond crossover and North Freight siding Cricklewood removed
15 Feb 2022 Freight service commence from South arrival Radlett Harper Lane (FLHH)
18/19 Aug 2022 Heatwave with no service on Tuesday 19th
08 Sept 2022 66 200 derails on hand points within Radlet Harper Lane stone loop
29 May 2023 last scheduled use of Class 180 fleet by E M R